The project consisted of Overhead to Underground electrical conversion which required 800 linear feet x 8 foot depth x 12 foot in width open cut. 4,200 linear feet 6 inch pipe, 2,400 linear feet 4 inch pipe, and 2,400 linear feet 3 Inch pipe. 500 LF Curb & Gutter, 500 LF x 15 foot in width Class C Concrete Sidewalk. 5,760 linear feet of 6 inch and 3 Inch PVC pipe was installed for future use from University Street to San Antonio Street. The project was delivered in July 2022 with zero infractions, fines, or environmental penalties.