Frio County Bridge Demolition and Excavation

The project consists of bridge excavation for cast-in-place concrete culvert bridge, and San Miguel Creek Channel clean-out for improved drainage. Project Start date 11/22/2022. Project delivered on time January 15, 2023. 

Existing County Road 2410 Bridge

Existing County Road 3314 Bridge 

CR 2410 Concrete Demolition

CR 2410 Demolition

CR 3314 Bridge Excavation

CR 3314 Bridge Excavation

CR 3314 Bridge Excavation

CR 3314 Bridge Excavation

CR 3314 Bridge Excavated, and San Miguel Creek Channel Clean-Out for Improved Drainage

CR 3314 San Miguel Creek Channel Clean-Out

CR 3314 San Miguel Creek Channel (Foreground), and Bridge Structure Box

Facing East: CR 3314 Bridge Structure Box 75' Span x 50' Width x 12' Depth, Pyramid Step Trench Protection

Facing East: CR 2410 Bridge Structure Box 65' Span x 40' Width x 10' Depth, Pyramid Step Trench Protection

Facing West: CR 2410 Bridge Structure Box, Public Temperary Road

Facing North East: CR 2410 Bridge Structure Box, Pyramid Step Trench Protection

Facing North West: CR 2410 Bridge Structure Box, Pyramid Step Trench Protection

Facing North: CR 2410 Bridge Structure Box

Facing South: CR 2410 San Miguel Creek Channel Clean-Out

©2025 RED DIRT ROAD AND BRIDGE CORPORATION®. All rights reserved.

We need your consent to load the translations

We use a third-party service to translate the website content that may collect data about your activity. Please review the details in the privacy policy and accept the service to view the translations.