City of San Marcos Guadalupe Street Sidewalk Project 

The project consisted of Overhead to Underground electrical conversion which required 800 linear feet x 8 foot depth x 12 foot in width open cut. 4,200 linear feet 6 inch pipe, 2,400 linear feet 4 inch pipe, and 2,400 linear feet 3 Inch pipe. 500 LF Curb & Gutter, 500 LF x 15 foot in width Class C Concrete Sidewalk. 5,760 linear feet of 6 inch and 3 Inch PVC pipe was installed for future use from University Street to San Antonio Street. The project was delivered in July 2022 with zero infractions, fines, or environmental penalties.   

4 ea. 4' x 4' x 8' Concrete Vault Installation for OH to UG Electrical Conversion

6" Pipe and 4" Pipe Electrical Conduit Bank

6" Pipe and 4" Pipe Electrical Conduit Bank

6" Pipe Electrical Conduit Bank

4" Pipe and 3" Pipe Electrical Conduit Bank

Conduit Bank Covered With Red Dye Flowable Fill

Guadalupe St., and MLK St. Inside Vault OH to UG Conversion Cable Run

Guadalupe St., and MLK St. Inside Vault OH to UG Electrical Conversion

9 ea. Tree Root Concrete Barrier Wall Installed

450 LF Class C Concrete Curb and Gutter

2 ea. Class C Concrete Driveways Poured

9 Sections Tree Silva Cells Installed

9 Sections Tree Silva Cells Installation Completed

9 ea. Pedestrian Light Poles Installed

Vault Manhole Installation

500' x  12' Class C Concrete Sidewalk

9 ea. Montezuma Cypress Trees - 3" Caliper Planted

Sidewalk Project Completion